A.polar regions
B.horse latitudes
C.roaring forties
D.doldrums
您可能感興趣的試卷
你可能感興趣的試題
A.daily lapse reading
B.diurnal variation of pressure
C.pressure tendency
D.synoptic pressure
A.Declaration of Deadweight Capacity
B.Notice of Demurrage
C.Notice of Despatch
D.Notice of Readines
A.noted
B.noticed
C.notified
D.notificated
A.bearings
B.distances
C.sections
D.positions
A.at
B.on
C.of
D.in
最新試題
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
This is to bring()your notice that MV Utopia has anchored too close to my ship.
In the absence of a custom or special contract to the contrary,the Shipowner is not bound to ()the consignees that he is ready to unload on arriving at the port of discharge.
The daily recurring pattern of pressure changes most noticeable in low latitudes is the ().
No()payable for loss resulting from delay or delivery unless a notice has been given in writing to the carrier within 60 consecutive days after the day the goods were handed over to the consignee.
The diurnal variation of pressure is most noticeable().
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ().
On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a().
Permission is kindly requested to()in celebration of our National Day.