A.short proof
B.ground proof
C.explosion proof
D.overload proof
您可能感興趣的試卷
你可能感興趣的試題
A.AC
B.DC
C.generator
D.fresh water generator
A.AC voltage to the armature
B.AC voltage to the field
C.DC voltage to the armature
D.DC voltage to the field
A.wash it with fresh water and apply an external source of heat
B.renew the windings
C.send it ashore to an approved service facility
D.rinse all electrical parts with a carbon tetrachloride cleaning solvent and then blow dry the motor with compressed air
A.the recommended current and voltage rating
B.higher current and voltage rating
C.higher current and lower voltage rating
D.lower current and higher voltage rating
A.prime mover governor
B.exciter generator
C.voltage regulator
D.reverse power relay
最新試題
The treatment of the fuel oils involves storage, heating, filtering and()
If separating effect is not good, which measure should be taken ()
To proceed to the assistance of a ship in distress is()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which of the following items don’t belong to dock repair works?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish