A.quartered
B.unchanged
C.doubled
D.quadrupled
您可能感興趣的試卷
你可能感興趣的試題
A.both generate alternating voltages
B.both rectify the voltage before delivery
C.are constructed at the same physical size for the same kilowatt rating
D.both supply three-phase power
A.increase the field excitation
B.decrease the field excitation
C.increase the number of magnetic poles
D.increase the speed of the prime mover
A.in series with the power source and load
B.in parallel with the power source and load
C.insuring correct polarity
D.using the lowest range possible to prevent instrument damage
A.main alternator field rheostat
B.exciter field rheostat
C.prime mover governor control
D.equalizing reactor
A.resistance will decrease
B.insulation will bum
C.temperature will increase
D.conductivity will increase
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The main purpose of port State control is not to()
The shipboard oil pollution emergency plan will be invalid after ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The treatment of the fuel oils involves storage, heating, filtering and()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.