A.Certificate of Inspection
B.Load line certificate
C.Certificate of Documentation
D.SOLAS Certificate
您可能感興趣的試卷
你可能感興趣的試題
A.Certificate of Inspection
B.Load line certificate
C.Certificate of Documentation
D.SOLAS Certificate
A.SOLAS Certificate is issued
B.Load Line Certificate is renewed
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
A.bridge
B.engineering control station
C.recreation and messrooms
D.fire control room
A.International Maritime Dangerous Goods Carried by Sea
B.International Code for the Construction and Equipment of Ships Carrying Gases in Bulk
C.International Convention for the Safety of Life at Sea
D.International Regulations for Preventing Collisions at Sea
A.in contrast to
B.in compliance with
C.the essence of
D.representing
最新試題
You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun’s chair.The proper way to do this is to ride down the stay on a riding shackle().
The safest procedure used to rig a guy and preventer is to have the guy().
Flanking rudders effect a vessel’s heading because of the().
An intermediate spring is().
What does the term end-for-end refer to in regard to a wire towing hawser().
Temporary Certificates of Inspection are effective until the().
A spanner is a().
Which of the following statements concerning the rigging of bosuns’ chairs and their use is TRUE().
The ladder shall().
When a davit-launched raft is lowered from a ship,upon becoming waterborne,the raft is released by().