A.100kw
B.400kw
C.500kw
D.600kw
您可能感興趣的試卷
你可能感興趣的試題
A.used to do mechanical work
B.used to establish the magnetic field of the motor
C.lost as heat generated by the windings
D.lost in doing work to turn the motor itself
A.an electrical interlock system
B.an automatic paralleling trip switch
C.the synchronizing oscilloscope
D.the reverse current relay
A.waterproof
B.drip proof
C.spray tight
D.spray proof
A.portable tools
B.large pump motors
C.turbo electric main motors
D.forced draft fans
A.5 volts, the output changes 10 volts
B.10 volts, the output changes 5 volts
C.2 volts, the output changes 10 volts
D.10 volts, the output changes 2 volts
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The shipboard oil pollution emergency plan will be invalid after ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
() is not installed on the main switchboar.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the following items don’t belong to dock repair works?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The treatment of the fuel oils involves storage, heating, filtering and()