A.slowly carried away
B.carried out with a period of delay
C.promptly carried out
D.paid by the captain
您可能感興趣的試卷
你可能感興趣的試題
A.automatically controlled
B.continuously manned
C.off power
D.none of the above is true
A.noted by the bridge officer
B.told by last duty engineer
C.observed
D.in the instruction manual
A.the chief engineer must be informed at first
B.the captain must be informed at first
C.it must be taken by the duty engineer
D.the generator engine must be stopped
A.captain
B.chief engineer
C.chief officer
D.chief motorman
A.Constant inspection
B.Keeping constant load
C.Remaining constant temperature
D.Varying speed
最新試題
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The condensers located in various stages of a flash evaporator are cooled by()
The treatment of the fuel oils involves storage, heating, filtering and()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Diesel engine air start system check valves are opened by ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The shipboard oil pollution emergency plan will be invalid after ()