A.masters
B.chief engineers
C.crew
D.all personnel
您可能感興趣的試卷
你可能感興趣的試題
A.communicate
B.verify
C.audit
D.evaluate
A.communicate
B.verify
C.audit
D.evaluate
A.should bring
B.should be brought
C.should take
D.should be taken
A.with
B.without
C.against
D.above
A.general alarm and fire control plans
B.muster stations and duties of individual
C.patrol system
D.All of the above
最新試題
Which of the following items don’t belong to dock repair works?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
If separating effect is not good, which measure should be taken ()
The ISPS Code consists of a mandatory section-Part A, which shows()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()