單項(xiàng)選擇題The process that occurs when heat is generated by a chemical reaction within a substance and continues to a point of ignition is known as ().

A.chemical ignition
B.spontaneous combustion
C.chemical combustion
D.radiation ignition


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題A vessel sailing through the specific special areas may discharge or dispose of ().

A.incinerated ash at anytime
B.fairly dense material that will sink, i√emetal cans or glass bottles at anytime
C.victual waste when at least 12 nautical miles from shore
D.absolutely no garbage at anytime

2.單項(xiàng)選擇題In order to find out which lifeboat you are assigned, you should look at the ().

A.fire control plan
B.certificate of inspection
C.muster list
D.ships articles

3.單項(xiàng)選擇題Fire and lifeboat stations are required to be listed on the ().

A.ships articles
B.muster list
C.bunk card
D.forecastle card

4.單項(xiàng)選擇題Your assigned emergency stations aboard your vessel can be found on the ships ().

A.muster list
B.certificate of inspection
C.clearance papers
D.permit to proceed

5.單項(xiàng)選擇題When off loading garbage to another ship, your records must identify that ship by name and ()

A.home port
B.operators name of record
C.official number
D.masters name

最新試題

The shipboard oil pollution emergency plan will be invalid after ()

題型:?jiǎn)雾?xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:?jiǎn)雾?xiàng)選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:?jiǎn)雾?xiàng)選擇題

Under MARPOL Code the ship to which it applies has to carry ()

題型:?jiǎn)雾?xiàng)選擇題

Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()

題型:?jiǎn)雾?xiàng)選擇題