A.spilling
B.leaking
C.dumping
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.remove combustibiles from direct exposure
B.cool the bulkhead around the fire
C.close all openings to the area
D.shut off electrical power
A.is properly vented
B.contains no explosive fumes
C.has no oil in the bilges
D.all of the above
A.an electrical switchboard
B.the pressure tanks
C.the fuel oil tanks
D.the oily rag bin
A.The garbage to be discharged will sink
B.Garbage accumulation onboard has exceeded storage space
C.A person falls overboard, and a plastic ice chest is thrown for flotation
D.The destination port or terminal cannot receive garbage
A.Engine room bilges
B.Paint locker
C.Battery storage locker
D.Fuel oil tank
最新試題
Cold weather starting of a diesel engine may be made easier by()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Using a file without a handle may result in ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The shipboard oil pollution emergency plan will be invalid after ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If separating effect is not good, which measure should be taken ()
To proceed to the assistance of a ship in distress is()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.