A.Reduce the pumping rate by closing the deck filling valve
B.Close all overflow valves
C.Place 5 gallon containers under all flange connections in the fuel line
D.Reduce the pumping rate and sound tanks frequently as the level rises
您可能感興趣的試卷
你可能感興趣的試題
A.Increased viscosity of the product needs higher loading pressure, which increases the chances of a spill
B.Air pockets may cause the fuel to bubble out of the ullage hole
C.The temperature rise of the fuel will cause an overflow
D.Fueling valve may become stuck closed and cause the fuel oil to spill before the valve can be opened
A.actuate an alarm and open the engine room control valve
B.actuate an alarm and open the engine room CO2 releasing valve
C.open the engine room control valve and shut off engine room ventilation fans
D.open the engine room control valve and then the CO2 releasing valve
A.to the bottom of the expansion trunk
B.to within 1% to 3% of its capacity
C.to within 1% to 3% inches of its capacity
D.1 to 3 inches from top of the vent pipe
A.draped over the fantail to dry out
B.drained over the side and washed out
C.drained into the bilges and washed out
D.drained into buckets or fuel tanks
A.open the watertight door and take a quick look
B.open the hatch dogs on the side away from the hinges
C.tap the bulkhead with a hammer to check for a water level
D.feel the bulkhead to see if it is hot
最新試題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The shipboard oil pollution emergency plan will be invalid after ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()