A.The watch keeping personnel
B.The chief engineer
C.The person on a bunker barge
D.The duty deck officer
您可能感興趣的試卷
你可能感興趣的試題
A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements
A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.port state control
B.flag state control
C.fire and boat drill
D.Safety inspection
最新試題
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The cetane rating of diesel fuel is an indication of the ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Diesel engine air start system check valves are opened by ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The main purpose of port State control is not to()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The shipboard oil pollution emergency plan will be invalid after ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()