A.Heats
B.Heating
C.To heat
D.Heated
您可能感興趣的試卷
你可能感興趣的試題
A.not to go against
B.don’t go against
C.not go to against
D.to not go against
A.To work
B.Working
C.Having worked
D.worked
A.to discharge
B.to be discharged
C.discharging
D.being discharged
A.to send
B.to be sent
C.for being sent
D.being to send
A.sub-boards
B.main switchboards
C.emergency switchboards
D.distribution boards
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Cold weather starting of a diesel engine may be made easier by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Using a file without a handle may result in ()
() is not installed on the main switchboar.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.