A.Failure of proper operation of propulsion and other essential machinery, as well as electrical installation
B.Failure of the proper operation of the main and auxiliary steering gear
C.Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration
D.Failure of the proper operation of emergency generator, lighting, batteries and switches
您可能感興趣的試卷
你可能感興趣的試題
A.trim
B.lean
C.draft
D.tonnage
A.back of the vessel
B.the middle portion of a ship
C.a backward movement of a vessel
D.across the ship, at right angles to the fore-and-aft centerline
A.One-hour notice
B.Dead slow ahead
C.Finished with engines
D.Half astern
A.dangerous
B.best
C.bad
D.important
A.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the spot
B.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the next port of call
C.Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired until the next stop
D.Any leaks in piping, propeller shaft, machinery, tanks, will have to be at least patched up
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The ISPS Code consists of a mandatory section-Part A, which shows()
To proceed to the assistance of a ship in distress is()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
() is not installed on the main switchboar.
The main purpose of port State control is not to()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()