A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
您可能感興趣的試卷
你可能感興趣的試題
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
A.Security level 1
B.Security level 2
C.Security level 3
D.Highest safety level
A.Security level 1
B.Security level 2
C.Security level 3
D.Medium safe level
A.Security level 1
B.Security level 2
C.Security level 3
D.Lowest safety level
A.BRC
B.MCC
C.AUT-0
D.AUT-1
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Cold weather starting of a diesel engine may be made easier by()
To proceed to the assistance of a ship in distress is()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The cetane rating of diesel fuel is an indication of the ()
The treatment of the fuel oils involves storage, heating, filtering and()
The main purpose of port State control is not to()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()