A.ISM Code
B.PSC
C.STCW 78/95
D.IMO
您可能感興趣的試卷
你可能感興趣的試題
A.ISM
B.DOC
C.SMC
D.PSC
A.ISM
B.DOC
C.SMC
D.PSC
A.ISM
B.DOC
C.SMC
D.PSC
A.spends;in
B.spent;on
C.has spent;on
D.had spent;in
A.Class A
B.Class B
C.Class C
D.B+C
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()