A.the third engineer
B.the PSCO
C.the surveyor
D.the chief engineer
您可能感興趣的試卷
你可能感興趣的試題
A.missing valve hand wheels
B.dirty tank tops
C.a large number of temporary repairs
D.All of the above
A.the manager of the company
B.the surveyor of the Classification Society
C.the master of the vessel
D.the chief engineer of the vessel
A.the survival craft launching equipment have never been used
B.the pivot points are seized
C.the lashing or stowing of deck cargo is improper
D.All of the above signs are evident
A.The quantity of oil residues generated
B.The capacity of sludge and bilge water holding tank
C.The capacity of the oily water separator
D.All of the above
A.the master
B.the chief engineer
C.the owner of the ship
D.the manager who assumes the responsibility for operation of the ship
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
The cetane rating of diesel fuel is an indication of the ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The condensers located in various stages of a flash evaporator are cooled by()
Which of the following items don’t belong to dock repair works?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()