A.supercharging
B.scavenging
C.turbulence
D.swept volume charging
您可能感興趣的試卷
你可能感興趣的試題
A.Each engine must have its own engine driven cooling water pump capable of providing cooling for all ranges of operation
B.propulsion engines with bores exceeding 200 mm are to be fitted with a means to display the cooling water temperature of each cylinder
C.At least two independent sea suctions are to be provided for supplying water to the engine jackets or to the heat exchangers
D.Suitable strain are to be fitted between the circulating pumps and heat exchangers when sea water is used for direct cooling
A.a clogged filter element
B.excessive lube oil pump discharge pressure
C.excessive lube oil flow
D.excessively hot lube oil
A.improper venting of the cooling system
B.carrying the expansion tank water level too high
C.a totally clogged impeller in the cooling water pump
D.an incorrectly set cooling system temperature control
A.crankcase
B.low lube oil temperature
C.excessive oil consumption
D.low bearing oil pressure
A.cam action
B.spring force
C.fuel oil pressure
D.firing pressure
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
To proceed to the assistance of a ship in distress is()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The main purpose of port State control is not to()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Using a file without a handle may result in ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()