A.24 hours
B.2 hours
C.1 hours
D.15 minutes
您可能感興趣的試卷
你可能感興趣的試題
A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.there were an actual emergency
A.100%
B.110%
C.85%
D.different
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of shaft
D.main engine crankshaft deflection
A.Voyage repairs
B.Routine docking
C.Damage repairs
D.Conversion
A.engine logbook
B.delivery docket
C.store booklet
D.maintenance book
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The cetane rating of diesel fuel is an indication of the ()
Using a file without a handle may result in ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the following items don’t belong to dock repair works?()
To proceed to the assistance of a ship in distress is()
The shipboard oil pollution emergency plan will be invalid after ()
The ISPS Code consists of a mandatory section-Part A, which shows()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()