A.loading
B.leaving
C.arriving
D.sailing
您可能感興趣的試卷
你可能感興趣的試題
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
A.spilling
B.leaking
C.dumping
D.All of the above
A.flat
B.up
C.upright
D.vertical
A.moors
B.moor
C.is moored
D.mooring
最新試題
The Master or person in charge of a ship shall ensure the crane record book shows the().
The net productivity per gang-hour can be improved through a decrease of().
What is the purpose of the equalizing beam aboard a crane vessel().
Pedestal cranes have limit switches to restrict movement of which function(s)().
Which method should be used to warm up the pump turbines prior to discharge().
What is/are the advantage(s)of cranes over conventional cargo booms().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
When discharging an oil cargo,the first consideration is to().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
How should you signal the crane operator to move slowly().