A.for the release of air from the cooling water
B.providing expansion room for heated cooling water
C.a place for implementing water and water treatment agent
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.1/2
B.1
C.2
D.3
A.non-synchronous electric motor
B.synchronous electric motor
C.fully enclosed electric motor
D.watertight electric motor
A.an increase in the exhaust temperature of the affected cylinder
B.the turbocharger may surge
C.the explosion pressure in all cylinders will rise violently
D.smoke from the turbocharger air inlet filter will be seen
A.refreshing the air
B.making person upset
C.adjusting the air humidity
D.adjusting the air temperature
A.15 liters nautical mile
B.30 liters nautical mile
C.60 liters nautical mile
D.100 liters nautical mile
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Under MARPOL Code the ship to which it applies has to carry ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.