A.MARPOL 73/78
B.SOLAS 74
C.STCW 78/95
D.ISPS 2002
您可能感興趣的試卷
你可能感興趣的試題
A.safety
B.the ship, its machinery and crew
C.immediate action
D.the engineer in charge
A.at the beginning of every watch
B.at the beginning of the first watch every day
C.at the completion of every watch
D.at noon every day
A.1/2
B.1
C.2
D.3
A.reciprocating pump
B.vane pump
C.screw pump
D.centrifugal pump
A.reciprocating pump
B.vane pump
C.mono pump
D.axial-flow pump
最新試題
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The ISPS Code consists of a mandatory section-Part A, which shows()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The shipboard oil pollution emergency plan will be invalid after ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()