A.the temperature and flow quantity of the exhaust gas from M/E
B.the quantity of steam demanded
C.the rotary speed and the cooling water temperature of main engine
D.efficiency of M/ turbocharger
您可能感興趣的試卷
你可能感興趣的試題
A.M/E turbocharger
B.exhaust gas boiler
C.incinerator
D.fresh water generator
A.the former
B.the latter
C.not for sure
D.same each other
A.0°F
B.18°F
C.32°F
D.50°F
A.open loop control
B.feedback
C.combining control
D.integral process
A.0~05Mpa
B.0~95Mpa
C.1~05Mpa
D.0~5Mpa
最新試題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The main purpose of port State control is not to()
The shipboard oil pollution emergency plan will be invalid after ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
If separating effect is not good, which measure should be taken ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The condensers located in various stages of a flash evaporator are cooled by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()