A.micro-seizure
B.sticking
C.scratched
D.breakage/ollapse
您可能感興趣的試卷
你可能感興趣的試題
A.micro-seizure
B.sticking
C.scratched
D.breakage/collapse
A.hazy light
B.hazy light brown
C.hazy light blue
D.hazy light grey
A.upwards;inwards
B.upwards;outwards
C.downwards;inwards
D.downwards;outwards
A.at the first stop after a long voyage egby anchoring if possible
B.at the first stop after arrival at harbor
C.at the first stop after low load running
D.at the first stop after passing river or canal passage
A.disengaged
B.engaged
C.assembled
D.disassembled
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The condensers located in various stages of a flash evaporator are cooled by()
The ISPS Code consists of a mandatory section-Part A, which shows()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Using a file without a handle may result in ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()