A.transmitter
B.receiver
C.pipes
D.charging unit
您可能感興趣的試卷
你可能感興趣的試題
A.transmitter
B.receiver
C.pipes
D.charging unit
A.hunting gear
B.cut-off level
C.servo-motor
D.swivel block
A.control equipment
B.power unit
C.transmission mechanisms
D.fittings and pipeline
A.dog clutch
B.Pair of gears
C.worm gear
D.turning gear
A.cranes
B.mooring barrel
C.capstans
D.cable lifter
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Which of the following items don’t belong to dock repair works?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The condensers located in various stages of a flash evaporator are cooled by()
The cetane rating of diesel fuel is an indication of the ()