A.made and noted as required by the duty engineer
B.reported to chief engineer immediately after being made by duty engineer
C.never made before getting permission from chief engineer
D.made as required but not logged
您可能感興趣的試卷
你可能感興趣的試題
A.the main propulsion plant
B.lifesaving jackets
C.lifeboat engine
D.state of emergency generator
A.the common ground point
B.the starter’s frame
C.the commutator
D.the starter’s mounting bolts
A.flame retardant
B.moisture resistant
C.oil resistant
D.low conductivity
A.Ring type
B.Fork type
C.Spade type
D.Push on pull off type
A.metal
B.wood
C.water
D.plastic
最新試題
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Diesel engine air start system check valves are opened by ()
Using a file without a handle may result in ()
To proceed to the assistance of a ship in distress is()
Which of the following items don’t belong to dock repair works?()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
() is not installed on the main switchboar.