A.winch
B.windlass
C.draw works
D.dynamic pay out system
您可能感興趣的試卷
你可能感興趣的試題
A.flex joint
B.slip joint
C.heave joint
D.riser joint
A.stringers
B.girders
C.breasthooks
D.deck beams
A.in
B.on
C.out
D.with
A.cargo handling machines
B.deck winches and derricks
C.engine-room tools
D.course controlling system
A.the galvanizing on steel
B.a hatch cover
C.the outer plating of a vessel
D.synonymous with decking
最新試題
A single fitting installed in a pipeline that either blanks off the pipe or allows a full flow passage of a liquid through the pipe is referred to as a().
The antennas of the trucks on deck are not fitted().
In vessel construction,a greater number of watertight bulkheads results in().
The platform that supports the derrickman when tripping pipe is called the().
Owing to the greater girth of a ship amidships than at the ends,certain strakes are dropped as they approach the bow and stern to reduce the amount of plating at the ends. These strakes are called().
Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().
Ship’s steering gear refers to().
Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this,you should().
Regulations require that access to a cargo pumproom in a tanker carrying grade D liquid cargo,shall be().
The opening in the deck that leads the anchor cable outside the hull is the().