A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
您可能感興趣的試卷
你可能感興趣的試題
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically
A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
Diesel engine air start system check valves are opened by ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
If separating effect is not good, which measure should be taken ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()