A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
您可能感興趣的試卷
你可能感興趣的試題
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
A.the SW outboard valves
B.the tailshaft LO stop valve
C.the drain valve of the boiler
D.propeller shaft sealing device
A.sea valve chest, sect valve, thruster
B.bilge motherboard, steering and the shaft system
C.sea water system
D.fresh water system
最新試題
To proceed to the assistance of a ship in distress is()
Using a file without a handle may result in ()
Diesel engine air start system check valves are opened by ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()