A.surveyor
B.chief engineer
C.captain
D.chief mate
您可能感興趣的試卷
你可能感興趣的試題
A.Ship Survey Bureau
B.CCS
C.Maritime Safety Administration
D.all of the above
A.starting
B.running
C.running-in
D.direction changing
A.after the mooring trial has passed
B.before the mooring trial
C.under the surveyors supervision
D.after repair
A.cold condition
B.stillness condition
C.certain air pressure
D.the surveyors supervision
A.take a further inspection in the voyage
B.check and repair, then retrial
C.do as the surveyor’s requirement
D.retrial
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Diesel engine air start system check valves are opened by ()
The shipboard oil pollution emergency plan will be invalid after ()
The treatment of the fuel oils involves storage, heating, filtering and()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
If separating effect is not good, which measure should be taken ()