A.Two main areas of skill are involved in the construction of ship
B.There are distinct divisions in responsibilities between naval architects and marine engineers
C.Each ship will assume varying proportions according to its type
D.Ships can be divided into different categories from different perspectives
您可能感興趣的試卷
你可能感興趣的試題
A.larger
B.equal
C.smaller
D.equivalent
A.equal
B.larger
C.smaller
D.equivalent
A.the lubricating oil consumption
B.the turbine blade temperature
C.the flow rate of fuel
D.scavenge air pressure
The ship emergency plan item should not include ()
Ⅰ.ifesaving,fire fighting, leakage blocking, abandon ship
Ⅱ.irst aid
Ⅲ.ntegration emergency
A.Ⅱ
B.Ⅲ
C.Ⅰ+Ⅲ
D.Ⅰ
A.two knock
B.three knocks
C.four knocks
D.five knocks
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which of the following items don’t belong to dock repair works?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The condensers located in various stages of a flash evaporator are cooled by()
Using a file without a handle may result in ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Cold weather starting of a diesel engine may be made easier by()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Under MARPOL Code the ship to which it applies has to carry ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.