A.tie rod
B.thrust block
C.bedplate of main engine
D.frame of main engine
您可能感興趣的試卷
你可能感興趣的試題
A.propeller
B.flying wheel
C.main engine
D.crankshaft
A.coke deposits
B.cylinder water temperature
C.asphalt in fuel oil
D.lub oil
A.changed accordingly
B.unchanged
C.positioned ahead
D.positioned astern
A.tank level
B.Various filters
C.Drains
D.seawater temperature
A.hot air
B.hot boiler water
C.cylinder water
D.hot seawater
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Diesel engine air start system check valves are opened by ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The cetane rating of diesel fuel is an indication of the ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.