A.The loading dock
B.The midpoint of the barge
C.Within 25 feet of the pump engine
D.Above the forward rake end
您可能感興趣的試卷
你可能感興趣的試題
A.At a 45° angle
B.At right angles
C.4 feet aft of the heel of the boom
D.Parallel to the boom
A.Ensure that slings are securely fastened around the load
B.Avoid careless winch operations,especially when handling fragile cargo
C.Exercise care when using hooks,crowbars,and similar tools
D.Keep the loads as close to the rail or deck as possible
A.Arch the back to add strength to the muscles
B.Bend his knees and lift with his legs
C.Bend his back and stoop
D.Bend his back and stoop with arms straight
A.Should not exceed
B.Must be up to
C.Should exceed
D.Should be about
A.get the bow up
B.discharge from the wings first
C.discharge from the centerline tanks first
D.discharge from amidships first
最新試題
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
The Master or person in charge of a ship shall ensure the crane record book shows the().
Most pedestal crane power is provided by().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
How should you signal the crane operator to move slowly().
When viewed from above,the best position for the guy in relation to the boom is().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
Damage by()shall not be considered as handling damage.
Which method should be used to warm up the pump turbines prior to discharge().
Which statement comparing a shipboard crane to conventional gear is TRUE().