A.continue to be responsible for machinery space operations despite the presence of the CE
B.hand over the responsibility actively
C.be responsible for the watching together with the chief engineer
D.assistant the chief engineer to control the machinery
您可能感興趣的試卷
你可能感興趣的試題
A.a pipe with welded connections
B.a pipe with several clips
C.a cement box
D.a leaking valve
A.make his decision independently
B.request the owner’s representative to provide proposals
C.cooperate with the flag State Administration’s representatives
D.consult the organization responsible for issuing the relevant certificates
A.prevent an unsafe ship proceeding to sea
B.prevent a ship threatening the marine environment
C.fine the ships
D.confirm a safe sailing
A.the master should be immediately informed
B.the master will be prohibited from contacting the Administration or other organization
C.he will carry out the inspection after the master be informed and be ready
D.he will carry out the inspection without informing the master
A.the PSCO’s general impression confirm a good standard of maintenance
B.the certificates are valid
C.the PSCO believes the ship doesn’t meet the requirements
D.the PSCO can’t find deficiencies at first glance
最新試題
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.