A.In the lower level of the pumproom
B.In the middle level of the pumproom
C.In the upper level of the pumproom
D.On the deck outside the pumproom
您可能感興趣的試卷
你可能感興趣的試題
A.weather deck
B.orlop deck
C.shelter deck
D.main deck
A.tripping line
B.tripping bracket
C.norman pin
D.steamboat ratchet
A.two chains of equal length
B.a single nylon pendant rove through a heavy ring free to move on the pendant
C.two long legs of wire rope shackled to a fishplate
D.a single length of heavy chain with both ends secured on deck to welded pad eyes
A.beach
B.deck
C.pier
D.towed vessel
A.a short length of line used for temporarily holding another line
B.a snatch block for handling a topping lift
C.an engine order telegraph
D.the brake on a cargo winch
最新試題
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
What is meant by the term TOPPING THE BOOM?()
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()
The process of lowering a boom to a horizontal position and onto its deck support is called().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
The terms ceiling and margin plate are associated with the().
What danger is presented if a waterspout passes over a ship?()
To warp a vessel means to().
When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
You are handling a mooring line and are instructed to Check the line.What should you do().