A.coiled
B.faked
C.flemished
D.seized
您可能感興趣的試卷
你可能感興趣的試題
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats
B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach
C.If tag lines are used to control a suspended load,they should be secured to the deck
D.Personnel not involved in the hoisting operation should be kept clear of the transfer area
A.Lowering the boom
B.Raising the boom
C.Spotting the boom over the deck
D.Swinging the boom athwartships
A.Heavy rains could cause downflooding
B.Visibility could be restricted by low clouds
C.Large waves could cause structural damage
D.Personnel may be injured by loose deck gear blown by the wind
A.matters
B.happens
C.refers
D.applies
A.anchor the vessel
B.bring the head into the wind
C.clean the decks
D.move the vessel by hauling on lines
最新試題
What is meant by the term TOPPING THE BOOM?()
The margin plate is the().
The stevedores have already stowed the porcelain ware()up to the deckhead.
You are handling a mooring line and are instructed to Check the line.What should you do().
Which tackle arrangement has the LEAST mechanical advantage().
The tweendecker has()below the main deck.
Fueling activities()waste liquids and vapor releases to air.
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
The terms ceiling and margin plate are associated with the().
What is TRUE about hoisting operations().