A.Under any condition
B.If the grounding lasts over 24 hours
C.If it creates a hazard to the environment
D.At the owner's discretion
您可能感興趣的試卷
你可能感興趣的試題
A.bifurcation
B.fish net area
C.anchorage area
D.dredging area
A.blocks have been overhauled
B.hauling parts of two tackles are attached
C.hauling part leads through the movable block
D.hauling part leads through the standing block
A.actual total loss
B.constructive total loss
C.general average
D.particular average
A.current setting your vessel on the wall
B.current setting into the lock chamber
C.an eddy working along the lower guide wall
D.current setting counterclockwise
A.any wire rope used for mooring
B.a fire-warp
C.a mooring line running diagonally to the keel
D.a mooring line perpendicular to the keel
最新試題
A “reaching” course is one in which the wind().
A tonnage tax is levied according to the().
A “Mediterranean moor” should be used when().
A “spring line” is().
A copy of the Articles of Agreement,less the signatures,is required to be posted. This document is called the().
A crew member is having an epileptic convulsion. You should().
A celestial body will cross the prime vertical circle when the latitude is numerically().
A ballasted vessel sinks enroute to a dry dock. Under these circumstances,the vessel’s owner can claim().
A continuous watertight bulkhead on a ship is normally also a(n)().
A chain bridle is preferable to a wire rope towing bridle on a long ocean tow because chain().