A.the total weight in air of the casing string is removed from the ship
B.the hook load (weight of the casing string) is removed from the ship
C.the weight of the casing inside the riser is removed from the ship
D.the weight of the casing string added to the weight of the fill-up mud is removed from the ship
您可能感興趣的試卷
你可能感興趣的試題
A.equal to the chains they are connecting
B.25% more than the chains they are connecting
C.50% more than the chains they are connecting
D.100% more than the chains they are connecting
A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension of the mooring line
D.50% over the working tension of the mooring line
A.removed from the anchor chain
B.connected to a buoy at the anchor
C.stripped back to the rig and secured
D.connected to a buoy halfway down the chain
A.keeps the ends from fraying
B.strengthens it
C.protects your hands
D.becomes part of a splice
A.a messenger
B.a stopper for nylon line
C.a U-bolt for securing a cargo whip to the winch drum
D.turns of twine around a rope end
最新試題
Manila slings should not be used to load().
The square knot is used for().
Anchor shackles should have a breaking strength that is().
A tackle by which the outer end of a boom is raised and lowered is the topping().
If kinking results while wire rope is being coiled clockwise,you should().
A splice that can be used in running rigging,where the line will pass through blocks,is a().
The rope which is the lightest is().
In moderate wind and current what should be the length of chain with a single anchor?()
A whipping is().
An anchor winch should be equipped with mechanical brakes capable of holding().