A.increasing the permeability of the pumproom
B.reduction of drill water from the storage tanks
C.a list caused by water filling the compartment
D.a reduced KG caused by water filling the compartment
您可能感興趣的試卷
你可能感興趣的試題
A.progressive downflooding
B.reducing the level of drill water from the storage tanks
C.causing a list due to the water in the compartment
D.reducing the KG to minimum allowable
A.one category I 406 Mhz satellite EPIRB
B.at least one life buoy on each side of the vessel fitted with a buoyant life line
C.at least 12 rocket parachute flares
D.All of the above
A.at work,only
B.in his or her berthing area,only
C.BOTH at work and in his or her berthing area
D.None of the above
A.have a design burst pressure of at least 25 psig
B.be capable of withstanding at least 2.0 psi vacuum without collapsing or constricting
C.be electrically continuous with a maximum resistance of ten thousand ohms
D.All of the above
A.six weeks
B.six months
C.twelve months
D.two years
最新試題
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?()
Fire may be spread by which means?()
During the manufacture of line,yarns are twisted together in the().
Each EPIRB required on a ship shall be stowed in a manner which will permit().
Each drilling unit equipped with helicopter fuel storage tanks must have the tanks installed as far as practicable from the().
Each hand portable fire extinguisher on a ship must be marked with().
During the day,a dredge will indicate the side on which it is safe to pass by displaying().
During which condition should the operator of a pedestal crane shutdown operations?()
During the day,a vessel picking up a submarine cable shall carry().
Fire protection regulations for towing vessels allow all of these types of fuel piping,EXCEPT().