A.the wake is less pronounced
B.the vessel is more responsive to the rudder
C.squat will cause a decrease in bottom clearance and an increase in draft
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.Buoyancy
B.Freeboard
C.Draft
D.Displacement
A.Press up any slack double-bottom tanks to eliminate free surface
B.Flood any empty double-bottom tanks to add weight low and down
C.Jettison topside weights to reduce KG and KB
D.Shift any off-center weights from port to starboard
A.press up a slack double bottom tank on the port side
B.fill an empty centerline double bottom tank
C.pump out a slack marine portable tank located on the portside amidships
D.jettison the anchors and anchor cables
A.Jettison any off-center topside weights to lower GM and correct the list
B.Pump out any slack after double-bottom tanks to reduce free surface and increase freeboard aft
C.Pump out the after peak and fill the forepeak to change the trim
D.Press up any slack double-bottom tanks forward of the tipping center,then fill the forepeak if empty
A.in
B.up
C.above
D.on
最新試題
It is apparent that there was not sufficient depth of water()and I claim that the estimated arrival draft as radioed to the agent to report to you was a close one.
It’ll affect neither the draft()the rotation of discharging.
In the absence of external forces,the center of buoyancy of an inclined vessel is vertically aligned directly below the().
Reserve buoyancy is the().
Intact buoyancy is a term used to describe().
If the cause of severe list or trim is off-center ballast,counterflooding into empty tanks will().
On a vessel,multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().
The center of buoyancy is located at the().
On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().
The difference between the initial trim and the trim after loading is known as().