A.before the boat is lowered from the stowed position
B.as the boat fall blocks break clear of the davit head
C.before the boat is lowered from the embarkation level
D.after the boat is released into the water
您可能感興趣的試卷
你可能感興趣的試題
A.has left already
B.left already
C.had left already
D.would left already
A.very good
B.good
C.poor
D.moderate
A.very
B.good
C.moderate
D.poor
A.navigate
B.arrive at
C.steer for
D.maneuver for
A.Bale cubic
B.Deadweight
C.Gross tonnage
D.Net tonnage
最新試題
A tide is called diurnal when().
Berthing means bringing a vessel to her berth until().
Before any loading takes place any signs of the previous cargo should do().
When the wave period and the apparent rolling period are the same().
In the Northern hemisphere northerly winds may cause temperature().
The loading of the ship must be done in accordance with().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
()is on the panel of radar.
Which of the following is not an operation mode of AIS?()
The company should establish and maintain procedures to control all documents and date which are relevant to().