A.RCC
B.OSC
C.CSS
D.GPS
您可能感興趣的試卷
你可能感興趣的試題
A.dredging ( of anchor )
B.dragging ( of anchor )
C.weighing anchor
D.walking out anchor
A.dredging ( of anchor )
B.dragging ( of anchor )
C.weighing anchor
D.walking out anchor
A.a distress message
B.an urgency message
C.a safety message
D.a message of SMCP
A.distress
B.safety
C.all clear
D.urgency
A.deck area
B.dining room on board
C.assembly station
D.hold
最新試題
The loading of the ship must be done in accordance with().
When the wave period and the apparent rolling period are the same().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
The company should establish and maintain procedures to control all documents and date which are relevant to().
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
()is on the panel of radar.
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
The ISM code is part of().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Bales close to the deckhead should be covered to prevent().