A.in the southeast quadrant of the storm
B.directly behind the storm center
C.forward and to the right of its course
D.behind and to the left of its course
您可能感興趣的試卷
你可能感興趣的試題
A.the position is suitable
B.the position is reliable
C.the position is changeable
D.the position is fixable
A.The two points are in low latitudes in the same hemisphere
B.The two points are in high latitudes in the same hemisphere
C.The two points are near the equator, but in different hemispheres
D.One point is near the equator, one point is in a high latitude, and both are near the 180th meridian
A.gale warning
B.24 hours forecast
C.synopsis
D.storm warning
A.at, to
B.to, from
C.from, to
D.at ,from
A.must be sent
B.be sent
C.would be sent
D.were sent
最新試題
ECDIS must be able to perform all of the following EXCEPT().
Manoeuvring information can not be obtained from().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The company should establish and maintain procedures to control all documents and date which are relevant to().
Before any loading takes place any signs of the previous cargo should do().
It is dangerous for vessels without the operational radar()the estuary.
What is it called when it is possible to ignite the vapour above the oil?()
A tide is called diurnal when().
When the wave period and the apparent rolling period are the same().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.