A.The doube bottom
B.The cofferdam
C.The navigating bridge
D.The superstucture
您可能感興趣的試卷
你可能感興趣的試題
A.double bottoms
B.cofferdam
C.navigating bridge
D.superstructure
A.The double bottom
B.The cofferdam
C.The navigating bridge
D.The superstructure
A.forecastle
B.tweendeck
C.hatches
D.peak tanks
A.forcastle
B.tweendeck
C.hatches
D.peak tanks
A.forcastle
B.tweendeck
C.hatches
D.peak tanks
最新試題
Berthing means bringing a vessel to her berth until().
The loading of the ship must be done in accordance with().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
It is dangerous for vessels without the operational radar()the estuary.
A tide is called diurnal when().
Fog is likely to occur when there is little difference between the dew point and the().
The mean draft of a ship is the draft().
The company should establish and maintain procedures to control all documents and date which are relevant to().
The ISM code is part of().
Which of the following shall not the officers in charge of the navigational watch do?()