A.A mooring winch
B.A windlass
C.A deck crane
D.A lifeboat
您可能感興趣的試卷
你可能感興趣的試題
A.metacentric height is positive
B.metacentric radius is positive
C.KG exceed maximum allowable limits
D.Free surfaces are excessive
A.20 minutes
B.15 minutes
C.10 minutes
D.5 minutes
A.2 minutes
B.3 minutes
C.4 minutes
D.5 Minutes
A.who have performed work for 14 hours
B.who have performed work in a scheduled rest period
C.who have performed work in a scheduled work period
D.who works hard
A.give access to
B.links up with
C.have contact with
D.is constructed of
最新試題
()is on the panel of radar.
Which of the following is not a form of precipitation?()
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
()is where the crew eat their meals.
How long are you prohibited to consume alcohol prior to serving as a member of a watch?()
Berthing means bringing a vessel to her berth until().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
The loading of the ship must be done in accordance with().
The mean draft of a ship is the draft().
What is it called when it is possible to ignite the vapour above the oil?()