A.Gross tonnage
B.Net tonnage
C.Displacement tonnage
D.Deadweight tonnage
您可能感興趣的試卷
你可能感興趣的試題
A.may always be complete and up-to-date
B.may not always be complete and up-to-date
C.may sometimes be complete and up-to-date
D.may not sometimes be complete and up-to-date
A.exhibited
B.established
C.constructed
D.built
A.integrating well-proven, harmonizing equipment
B.integrating all equipment in the bridge
C.an intelligent platform with ECDIS and Radar
D.the control center based on ECDIS
A.though
B.tough
C.through
D.trough
A.northeast
B.southwest
C.southeast
D.northwest
最新試題
Full details of all lights and fog signals are shown on().
The force resulting from the earth’s rotation that causes winds to deflect to the right in the Northern Hemisphere and to the left in the Southern Hemisphere is called().
The ISM code is part of().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
What is a CORRECT reply to a pilot’s request, How’s your heading?()
The loading of the ship must be done in accordance with().
The company should establish and maintain procedures to control all documents and date which are relevant to().
ECDIS must be able to perform all of the following EXCEPT().
A tide is called diurnal when().
()is on the panel of radar.