單項(xiàng)選擇題Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A.logical models 
B.physical models 
C.design models 
D.implementation models


你可能感興趣的試題

1.單項(xiàng)選擇題超出項(xiàng)目經(jīng)理控制的成本增加因素,除了存款利率、貸款利息和稅率外,還包括()。

A.項(xiàng)目日常開支的速度和生產(chǎn)率 
B.項(xiàng)目日常開支的速度和工期拖延 
C.項(xiàng)目補(bǔ)貼和加班 
D.原材料成本和運(yùn)輸成本 

2.單項(xiàng)選擇題經(jīng)濟(jì)計(jì)量分析的工作程序依次是()。

A.設(shè)定模型、檢驗(yàn)?zāi)P?、估?jì)模型、改進(jìn)模型 
B.設(shè)定模型、估計(jì)參數(shù)、檢驗(yàn)?zāi)P汀?yīng)用模型 
C.估計(jì)模型、應(yīng)用模型、檢驗(yàn)?zāi)P?、改進(jìn)模型 
D.搜集資料、設(shè)定模型、估計(jì)參數(shù)、應(yīng)用模型 

5.單項(xiàng)選擇題一般來說,多項(xiàng)目管理從項(xiàng)目目標(biāo)上看項(xiàng)目可能是孤立無關(guān)的,但是這些項(xiàng)目都是服務(wù)于組織的產(chǎn)品布局和戰(zhàn)略規(guī)劃,項(xiàng)目的協(xié)作管理不包括()。

A.共享和協(xié)調(diào)資源 
B.項(xiàng)目進(jìn)行集中的配置管理 
C.統(tǒng)一收集和匯總項(xiàng)目信息 
D.與甲方的技術(shù)主管部門的溝通