A.approximate
B.approximately
C.about
D.similar
您可能感興趣的試卷
你可能感興趣的試題
A.Would there be
B.There should be
C.Should there be
D.Would there be
A.on
B.For
C.To
D.On
A.at
B.in
C.of
D.with
A.rising
B.arising
C.raising
D.arousing
A.addressed
B.resolved
C.solved
D.dealt in
最新試題
All the losses()from your delay in shipping our goods will be for your account.
For all the remaining items the stated dates of shipment are(),but in no case would these dates be exceeded by ten days.
The WTO hasnot()the issue of the trade in agricultural products.
After inspection of the above shipment we found 5 cases().
Nobody knows the time of shipment,()?
And in the United States,13 antidumping suits were()Korean firms.
Damage()the goods was caused by heavy rain during transit.
The total CIP value of your order comes()$960 instead of $690,the difference()$270.
We have made()that we would accept D/P terms for your present order.
Damages to the goods were caused by heavy snow()transit.