A.yellow lights at each end
B.two red lights in a vertical line
C.a black ball
D.a diamond shape
您可能感興趣的試卷
你可能感興趣的試題
A.when
B.which
C.that
D.then
A.the estimated cost of damage
B.the name of the owner or agent of the vessel
C.an evaluation of who was at fault
D.the amount of ballast on board
A.Notice of Demurrage
B.Survey Report
C.Notice of Readiness
D.Notice of Responsibility
A.At
B.On
C.Of
D.In
最新試題
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
That BE IT KNOWN THAT MV GLUCKAULF UNDER MY COMMAND HAS A DWC OF 12,431 M/T ON SUMMER LOADLINE,AND A BALE CAPACITY OF 18,439 CU.M.AND A GRAIN CAPACITY OF 19,941 CU.M.is likely to be the wording of().
Please return the notice to me()due time.
the undersigned,Master of MV Roslyn,certify that my vessel()the conditions laid down in Articles 18 and 45 of the Navigation Regulations.
The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ().
The Experimental Lighthouse-buoy has no navigational significance and may be removed at will.The above sentence means().
The Local Notice to Mariners is usually published().
The diurnal pressure variation is most noticeable in the().
This is to bring()your notice that MV Utopia has anchored too close to my ship.
The diurnal variation of pressure is most noticeable().