A.Light List
B.American Practical Navigator
C.Notice to Mariners
D.Coast Pilot
您可能感興趣的試卷
你可能感興趣的試題
A.awarding
B.giving
C.granting
D.providing
A.yellow lights at each end
B.two red lights in a vertical line
C.a black ball
D.a diamond shape
A.when
B.which
C.that
D.then
A.the estimated cost of damage
B.the name of the owner or agent of the vessel
C.an evaluation of who was at fault
D.the amount of ballast on board
A.Notice of Demurrage
B.Survey Report
C.Notice of Readiness
D.Notice of Responsibility
最新試題
The Experimental Lighthouse-buoy has no navigational significance and may be removed at will.The above sentence means().
I’m not fully aware()what happened at the loading port.
This is to advise you that MV Water Way arrived at Sheerness at 1000 hours on May 14th and the formalities for entering the port were passed at 1040 hours on the same day.Now she is in all respects ready and fit to discharge her cargo of grain in bulk. Theses sentences are likely to appear in().
Ships changing their location within the port limits are also required to report their new ().
The issue of Notices to Mariners of charts and these aids(Radar beacons)may be delayed until such time as they are assessed to be().
The external flotation bladder on an immersion suit should be inflated().
the undersigned,Master of MV Roslyn,certify that my vessel()the conditions laid down in Articles 18 and 45 of the Navigation Regulations.
The daily recurring pattern of pressure changes most noticeable in low latitudes is the ().
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
My Captain is trying to()the pilot station before the ebb tide.