A.to be carried out
B.carry out
C.be carried out
D.will carry out
您可能感興趣的試卷
你可能感興趣的試題
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
最新試題
The anchors on the bow are known as().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
I saw the cargo surveyor()the cargo on deck just a minute ago.
Chain slings are suitable for heavy slender articles,such as().
The bottom of the mast rests on a part of the keel called the mast().
The end of the joint with the exterior threads is called the().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
During fueling,all doors,hatches,and ports().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
Connecting elements of a mooring system should be fabricated from().