單項(xiàng)選擇題Please arrange the survey()early.

A.to be carried out
B.carry out
C.be carried out
D.will carry out


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Please arrange()a surveyor to inspect the damaged bulkhead.

A.of
B.for
C.with
D.in

3.單項(xiàng)選擇題Let’s submit the case() the cargo surveyor.

A.to
B.of
C.for
D.about

4.單項(xiàng)選擇題In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()

A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator

5.單項(xiàng)選擇題In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().

A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material